Important information for drivers:
The island of Murter is connected to the mainland (town of Tisno) by a movable bridge, which regulates the dynamics of sea and road traffic.
Bridge lifting timetable:
1st June – 15th September – every day: 9 am - 9.20 am, and 6 pm - 6.20 pm
16th September - 31st May - Monday and Friday: 9 – 9.20 am